There is talk of RamJam "testing" sometime this spring. I figured I would open a thread here so we can discuss it and maybe make some sort of plans.
I have not done a lot to the 93 minus getting it mostly road worthy. I need to fix a few more things and steal the 31's off the 91( It has 33's but they are not um trustworthy? and not fun to drive with down the road at 70 ) there is soo much more I want to get done to it, but won't be able to until after the 2000 and 91 are finished.
I am open almost any time as long as I get advanced notice, minus easter weekend.
I have not done a lot to the 93 minus getting it mostly road worthy. I need to fix a few more things and steal the 31's off the 91( It has 33's but they are not um trustworthy? and not fun to drive with down the road at 70 ) there is soo much more I want to get done to it, but won't be able to until after the 2000 and 91 are finished.
I am open almost any time as long as I get advanced notice, minus easter weekend.